MASSDEP DECLARES WATER SUPPLY EMERGENCY IN HAVERHILL

MASSDEP DECLARES WATER SUPPLY EMERGENCY IN HAVERHILL

On Wednesday, November 18, 2026, the Massachusetts Department of Environmental Protection (MassDEP) declared a Water Supply Emergency in Haverhill, effective immediately. The official declaration gives the City permission to move forward with its plans to implement an interconnection with the City of Methuen, activate its test well for pumping, and clarifies the steps Haverhill must take to draw water from the Merrimack River and begin construction on its permanent Radial Collector Well (RCW) near 309 East Broadway.

Haverhill Mayor Melinda E. Barrett said, “Although the City cannot yet withdraw water from the Merrimack River, we will continue doing everything in our power to keep the forward momentum gained in recent weeks to fill Kenoza Lake. Our immediate actions will include taking all necessary steps to initiate our interconnection with Methuen, activate our test well for pumping, maintain and enforce Haverhill’s mandatory total ban on any nonessential outdoor use, and encourage indoor water conservation practices until further notice.”

Barrett added, “The City expects to begin withdrawing water from Methuen by mid-December and activate our test well by the end of December. We will continue to work collaboratively with our local, state, and federal partners to meet all requirements outlined in the Emergency Declaration, including completing water quality monitoring analysis on water collected from the Merrimack River to ensure this source is safe for our residents to drink. At the same time, the Mayor’s Office will continue to update the community on the status of our water supply and every effort to replenish it.”

Prior to declaring an emergency, MassDEP conducted a site visit in Haverhill on November 17 to closely observe the City’s current water supply. The conditions observed at Haverhill’s reservoirs and the information that Department of Public Works (DPW) Water Division Director Robert Ward provided to MassDEP, prompted the agency to declare the emergency.

The declaration allows the City to launch a multi-pronged effort to replenish Haverhill’s water supply and prevent its residents and businesses from potentially losing access to water under the following conditions:

 

For the duration of the Emergency Declaration, Haverhill, in summary, shall:

  1. Maintain and enforce a mandatory total ban on any nonessential outdoor water use.

  2. Provide public notice of the Emergency Declaration and ban on all essential outdoor water use.

  3. Submit to MassDEP in writing by November 23, 2026, the elevation levels of Round Pond and the operational challenges with its supplying water to Kenoza Lake.

  4. Submit to MassDEP a written progress report every two weeks unless other directed, with complete instructions outlined in the formal declaration.

  5. Install and operate an emergency interconnection with the Methuen Water Department, with conditions outlined in the formal declaration.

  6. Utilize the test well located near 309 East Broadway, with conditions outlined in the formal declaration.

  7. Increase Lead and Copper Rule (LCR) sampling to verify that the changes are operating consistently with the corrosion control strategy and LCR results remain below action levels; perform monthly water quality monitoring at all approved coliform sampling; and biweekly monitoring at the Water Treatment Plant entry point.

  8. Conduct all sample collection, handling, preservation, and analysis in accordance with the procedures referenced or define in 310 CMR 22.00, and provide all samples to MassDEP as soon as they are available.

  9. Submit a written report documenting all efforts taken by the City to implement and enforce the ban on nonessential outdoor water use and efforts to encourage customer to minimize indoor water use.

  10. Comply with all terms and conditions of its Water Management Act Permit Registration.

  11. Ensure that all construction, operation, and maintenance of all actions taken in response to this Emergency Declaration shall be performed in compliance with all applicable local, state, and federal laws and regulations.

  12. By December 31, 2026, submit a water supply emergency plan, which considers the provisions at 310 CMR 36.40 (5), for MassDEP’s review and approval.

MassDEP officials said they will consider approving the City’s request to withdraw water from the Merrimack River if the following additional steps are taken:

  • Submit design plans stamped by a Professional Engineer of the temporary intake and pump system necessary to withdraw water from the Merrimack River as well as a detailed raw water transmission main layout to the Millvale Reservoir;

  • Complete water quality monitoring analysis in accordance with the new source approval process for surface water sources as outlined in the Guidelines for Public Water Systems Chapter 3: Surface Water Supply Development. This shall alsoinclude monitoring and analysis for per- and polyfluoroalkyl substances (“PFAS”) in accordance with EPA Method 537 or EPA Method 537.1 unless otherwise by MassDEP;

  • Submit a detailed timeline and schedule for construction as well as anticipated withdrawal volume of Merrimack River water needed to replenish and stabilize the Kenoza Lake surface water source; and

  • Submit a proposed water quality monitoring plan and schedule that accounts for both water quality impacts to Millvale Reservoir from the transfer of Merrimack River water directly into Millvale Reservoir as well as source water impacts on the WTP efficacy. Details on jar testing and other analytical procedures such as salinity testing data within the Merrimack River should be provided to characterize and quantify water quality impacts throughout the surface water.

In addition, the following are the steps Haverhill needs to take before drawing water from Methuen:

  1. The interconnection shall be equipped with a totalizing flow meter.

  2. Haverhill shall maintain records of all water pumped from the emergency interconnection as required under the Regulations during the duration of this Declaration and provide those records to the Department upon request.

  3. Haverhill shall ensure that an intermunicipal agreement is in place between Haverhill and Methuen that outlines all conditions for use including volume as well as all maintenance requirements and emergency repairs of the interconnection appurtenances.

  4. Haverhill shall ensure routine inspections are sufficient to ensure the safety of the exposed equipment. A copy of the intermunicipal agreement shall be provided to the Department upon request.

  5. Within 24 hours of the interconnection activation, Haverhill shall conduct a full set of bacteriological sampling with chlorine residual measurements and water quality parameters (minimum to include pH, temperature, orthophosphate, conductivity, and alkalinity) at all approved coliform sampling locations. Results shall be reported to MassDEP as soon as available but no more than 24 hours after receipt by Haverhill.

The following are the steps Haverhill needs to take before activating the East Broadway Test Well:

  1. Withdrawal volume from this temporary test well shall not exceed greater than 0.6 MGD and shall be directed solely to the Millvale Reservoir;

  2. Baseline monitoring of the Millvale Reservoir shall occur prior to use of the temporary test well that includes but is not limited to Calcium, Chloride, Hardness, Iron, Manganese, Magnesium, pH, PFAS, Potassium, Sodium, Dissolved and Total Organic Carbon;

  3. Within sixty (60) days of issuance of this Emergency Declaration, Haverhill shall submit a Water Management Act permit application for the RCW project;

  4. Within one hundred twenty (120) days of issuance of this Emergency Declaration, Haverhill shall submit all necessary filings with MEPA for the RCW project;

  5. Haverhill shall discontinue use of this temporary test well source should either Millvale Reservoir or Kenoza Lake elevations reach 44’ and 114’ respectively; and,

  6. During use of the temporary test well, Haverhill shall conduct dual sample sets of both the raw and finished WTP water at minimum monthly frequency for Iron, Manganese, and PFAS6.

Tips for Indoor Water Conservation

Haverhill residents should continue indoor and outdoor water conservation efforts including abstaining from all non-essential outside water use, listed on the City’s website and defined in 310 CMR 36.03.

  • Fix leaks promptly
  • Run full dishwasher and laundry loads
  • Install water-efficient fixtures
  • Take shorter showers
  • Don’t run water during daily routines such as washing hands, brushing teeth, and washing dishes in the sink
  • Only flush toilets as needed

Background

On November 5, 2026, Haverhill’s Director of DPW for the Water Division Bob Ward submitted a petition to MassDEP formally requesting the agency declare a Water Supply Emergency in Haverhill after months of drought conditions resulted in an inability to replenish the City’s already dwindling water supply.

More Information

For more information about Haverhill’s water supply emergency, including Frequently Asked Questions (FAQs), indoor water conservation tips, information on Haverhill’s Non-essential Outdoor Water Use Ban, all press releases to date, DPW PowerPoint presentations delivered to the City Council, and more, visit www.haverhillma.gov/water-supply-emergency.

Contact Us

Haverhill City Hall
4 Summer Street
Haverhill MA, 01830

Monday - Friday 8:00 - 4:00
Call Center 311 (within city limits)
(978) 358-1311 (outside the city)

Online Service Requests