Radial Collector Well (RCW) Installation
Project Overview
Haverhill's ongoing drought has significantly reduced reservoir levels, creating an urgent need for additional water supplies. The City is implementing temporary emergency connections to the Merrimack River and the City of Methuen to supplement its existing water supply.
At the same time, the City is advancing construction of a permanent Radial Collector Well along the Merrimack River to provide a reliable, long-term water source and strengthen the City's water supply system.
Actions being taken:
- Installing a temporary water supply connection with the City of Methuen.
- Installing temporary piping and pumping equipment from the Merrimack River to Millvale Reservoir.
- Utilizing the East Broadway test well to supplement water supplies.
- Working with regulatory agencies to obtain necessary permits and approvals.
- Expediting construction of the permanent Radial Collector Well.
- Continuing to monitor reservoir levels and enforce water conservation restrictions.
Project Information
Location
309 East Broadway, Haverhill, MA 01830 up Millvale Road
Ward
Ward 4
Project Type
Water Supply
Project Phase
Design, Permitting & Construction
Anticipated Completion
January 2027 – Temporary Water Supply Connection to the Merrimack River
January 2027 – Connection with Methuen Water Supply
July 2028 – Permanent Well Installation
Project Manager
Robert Ward, DPW Director
John D’Aoust, Water Treatment Plant Manager
Andew Carvalho, Water Maintenance Supervisor
Shaun Burrier, Water/Wastewater Engineer
Consultant
Contractor
Background
The City of Haverhill has been working to develop an additional drinking water source for more than a decade. In 2016, the City identified the Merrimack River as its most viable option for meeting future water demands and providing a backup to its existing reservoirs.Wright-Pierce recommended constructing a Radial Collector Well near 309 East Broadway, using natural filtration through the riverbed to provide an additional source of drinking water.
In October 2016, the City Council authorized $17,168,750 for the project.
In June 2026, the Council approved additional borrowing for the acquisition of 309 East Broadway.
With continued drought conditions placing significant pressure on existing reservoirs, the City is now accelerating the permanent well project while implementing temporary emergency water supply improvements.
Water Supply Status
Current daily demand: Approximately 5 MGD.
Proposed Radial Collector Well capacity: 9 MGD.
Additional capacity: Approximately 4 MGD beyond current demand, potentially available to help replenish Kenoza Lake.
Current Reservoir Levels – November 19, 2026

The chart illustrates the impact of prolonged drought conditions on Haverhill's three primary water supply reservoirs.
The orange dashed lines represent each reservoir's full water elevation, while the blue areas illustrate current water levels.
These measurements represent water-surface elevations, not the actual depth or volume of water remaining. The illustrations are not to scale.
The declining reservoir levels demonstrate the severity of the ongoing drought and the need to secure additional water supplies. Although Crystal Lake and Millvale Reservoir can supplement Kenoza Lake under normal operating conditions, drought has reduced the water available from these sources.
These conditions highlight the importance of the City's emergency water supply improvements and ongoing construction of the permanent Radial Collector Well to protect Haverhill's drinking water supply.
Kenoza Lake (as of 11/19/26)
Current Level: 97.1 feet
Level When Full: 114.5 feet
Crystal Lake (as of 11/19/26): Pumping capacity is 3.0 million gallons per day
Current Level: 145.1 feet
Level When Full: 151.1 feet
Millvale Reservoir (as of 11/19/26): Pumping capacity is 2.0-9.2 million gallons per day
Current Level: 38.1 feet
Level When Full: 44.7 feet
How much water can each source provide?
|
Water source |
Capacity or expected supply |
Current status |
|
Kenoza Lake |
City's primary water supply reservoir |
Critically low |
|
Crystal Lake |
1–3 MGD pumping rate |
Supplementing Kenoza |
|
Millvale Reservoir |
2–9.2 MGD stated pumping capacity |
Offline due to low levels |
|
Round Pond |
Gravity-fed supply to Kenoza |
Current contribution unconfirmed |
|
Methuen emergency connection |
Up to 1 MGD |
Installation planned |
|
East Broadway temporary test well |
Up to 0.6 MGD |
Authorized with conditions |
|
Direct Merrimack River withdrawal |
Not yet established |
Awaiting approval |
|
Permanent Radial Collector Well |
Expected 7–9 MGD |
Ongoing |
Project Milestones
2012: The City Council adopted recommendations to pursue an additional drinking water source.
2014: Engineering studies confirmed the suitability of the East Broadway location.
October 2016: The City Council authorized a $17,168,750 loan order for the new water source and transmission main.
May 19, 2026: The City Council advanced the acquisition of 309 East Broadway.
June 2, 2026: The City Council approved a $900,000 loan order toward acquiring the property.
October 23, 2026: The Water Department requested an increase in the original RCW loan order from $17,168,750 to $26,075,850 to accelerate construction.
November 2026: The City advanced emergency water supply improvements, permitting, procurement, and construction preparations for the permanent RCW.
The ongoing drought has reinforced the need to complete the permanent water source while implementing temporary measures to protect Haverhill's drinking water supply.
Construction Updates
Temporary Merrimack River Connection: N. Granese & Sons is scheduled to begin installing temporary piping and pumping equipment the week of November 23, 2026. Anticipated completion: January 2027.
The City initially proposed placing temporary piping along properties on Millvale Road to avoid costly roadway excavation and minimize construction disruptions. Unfortunately, the City was unable to obtain cooperation from all affected property owners, requiring the project to be redesigned to install piping underground within the roadway.
This change results in additional construction costs, increased roadway disruption, and a greater financial burden on the City.
Haverhill's water supply emergency affects our entire community, regardless of whether individual properties receive City water or use private wells. Cooperation from all residents is essential to minimizing unnecessary costs and ensuring these critical improvements can move forward as quickly and efficiently as possible.
Methuen Water Interconnection: Construction is also scheduled to begin the week of November 23, 2026. Anticipated completion: January 2027.
Permanent Radial Collector Well: Engineering, permitting, and construction preparations are underway. Anticipated completion: July 2028.
Traffic Changes
Traffic impacts, road closures, and detour information will be provided as construction plans and schedules become available.
Financing
October 2016: City Council authorized $17,168,750 for the planning, design, and construction of the new Radial Collector Well and transmission main.
June 2, 2026: City Council approved a $900,000 loan order for the acquisition of 309 East Broadway.
October 2026: The City requested an increase in the original RCW loan order from $17,168,750 to $26,075,850 to advance construction.
State Revolving Fund (SRF): The City has submitted a funding application and is pursuing low-interest financing to help fund the project.
Community Engagement
The City continues to encourage residents to comply with water restrictions and practice conservation.
dcr-tips-for-saving-water-8-18-16.pdf
Learn More About the Project
State Grants $3.5M for Varied Haverhill Downtown, Well Water, Café Projects (WHAV, October 1, 2026)
Haverhill Council Signs Off on $1.8M East Broadway Purchase (WHAV, June 2, 2026)
Haverhill to Consider E. Broadway Taking, Status of Water Main-Damaged Home (WHAV, June 1, 2026)
Haverhill Reaches Pact to Buy Entire E. Broadway Parcel for Water Well (WHAV, May 17, 2026)
State Approves Low-Interest $66.5M Loan for Haverhill, $45M for Groveland, Others (WHAV, April 5, 2026)
Haverhill Councilors Can’t Agree on Land Taking for E. Broadway Well (WHAV, March 10, 2026)
Haverhill Councilors Put Off City Land Taking for Riverbank Well While Negotiations Continue (WHAV, February 11, 2026)
Haverhill Consider Supplemental Water Supplies, Including Those in Other Towns (WHAV, January 28, 2026)
Federal Delegation Secures Grant of $1 Million for Haverhill Riverbank Well Project—the State’s First (WHAV, January 18, 2026)
Basiliere Calls for Possible Land Taking to Speed 9-Year-Old Plan to Tap Merrimack River for Water (WHAV, October 7, 2025)
Council Approves River Well Plan; Rates to Increase 50% (WHAV, October 12, 2016)