Radial Collector Well (RCW) Installation

Project Overview

Haverhill's ongoing drought has significantly reduced reservoir levels, creating an urgent need for additional water supplies. The City is implementing temporary emergency connections to the Merrimack River and the City of Methuen to supplement its existing water supply.

At the same time, the City is advancing construction of a permanent Radial Collector Well along the Merrimack River to provide a reliable, long-term water source and strengthen the City's water supply system.

Actions being taken:

  • Installing a temporary water supply connection with the City of Methuen.
  • Installing temporary piping and pumping equipment from the Merrimack River to Millvale Reservoir.
  • Utilizing the East Broadway test well to supplement water supplies.
  • Working with regulatory agencies to obtain necessary permits and approvals.
  • Expediting construction of the permanent Radial Collector Well.
  • Continuing to monitor reservoir levels and enforce water conservation restrictions.

Project Information

Location

Ward

Ward 4

Project Type

Water Supply

Project Phase

Design, Permitting & Construction

Anticipated Completion

January 2027 – Temporary Water Supply Connection to the Merrimack River

January 2027 – Connection with Methuen Water Supply

July 2028 – Permanent Well Installation

Project Manager

Robert Ward, DPW Director

John D’Aoust, Water Treatment Plant Manager

Andew Carvalho, Water Maintenance Supervisor

Shaun Burrier, Water/Wastewater Engineer

Consultant

Background

The City of Haverhill has been working to develop an additional drinking water source for more than a decade. In 2016, the City identified the Merrimack River as its most viable option for meeting future water demands and providing a backup to its existing reservoirs.Wright-Pierce recommended constructing a Radial Collector Well near 309 East Broadway, using natural filtration through the riverbed to provide an additional source of drinking water.

In October 2016, the City Council authorized $17,168,750 for the project. 

In June 2026, the Council approved additional borrowing for the acquisition of 309 East Broadway.

With continued drought conditions placing significant pressure on existing reservoirs, the City is now accelerating the permanent well project while implementing temporary emergency water supply improvements.

 

Water Supply Status

Current daily demand: Approximately 5 MGD.

Proposed Radial Collector Well capacity: 9 MGD.

Additional capacity: Approximately 4 MGD beyond current demand, potentially available to help replenish Kenoza Lake.

 

Current Reservoir Levels – November 19, 2026

Reservoir elevations as of November 19, 2026 show Kenoza Lake with 97.1ft, Crystall Lake with 145.1ft, and Millvale Reservoir with 38.1ft.

The chart illustrates the impact of prolonged drought conditions on Haverhill's three primary water supply reservoirs.

The orange dashed lines represent each reservoir's full water elevation, while the blue areas illustrate current water levels.

These measurements represent water-surface elevations, not the actual depth or volume of water remaining. The illustrations are not to scale.

The declining reservoir levels demonstrate the severity of the ongoing drought and the need to secure additional water supplies. Although Crystal Lake and Millvale Reservoir can supplement Kenoza Lake under normal operating conditions, drought has reduced the water available from these sources.

These conditions highlight the importance of the City's emergency water supply improvements and ongoing construction of the permanent Radial Collector Well to protect Haverhill's drinking water supply.

 

Kenoza Lake (as of 11/19/26)

Current Level: 97.1 feet

Level When Full: 114.5 feet


Crystal Lake (as of 11/19/26): Pumping capacity is 3.0 million gallons per day

Current Level: 145.1 feet

Level When Full: 151.1 feet


Millvale Reservoir (as of 11/19/26): Pumping capacity is 2.0-9.2 million gallons per day

Current Level: 38.1 feet

Level When Full: 44.7 feet

 

How much water can each source provide?

Water source

Capacity or expected supply

Current status

Kenoza Lake

City's primary water supply reservoir

Critically low

Crystal Lake

1–3 MGD pumping rate

Supplementing Kenoza

Millvale Reservoir

2–9.2 MGD stated pumping capacity

Offline due to low levels

Round Pond

Gravity-fed supply to Kenoza

Current contribution unconfirmed

Methuen emergency connection

Up to 1 MGD

Installation planned

East Broadway temporary test well

Up to 0.6 MGD

Authorized with conditions

Direct Merrimack River withdrawal

Not yet established

Awaiting approval

Permanent Radial Collector Well

Expected 7–9 MGD

Ongoing

 

Project Milestones

2012: The City Council adopted recommendations to pursue an additional drinking water source.

2014: Engineering studies confirmed the suitability of the East Broadway location.

October 2016: The City Council authorized a $17,168,750 loan order for the new water source and transmission main.

May 19, 2026: The City Council advanced the acquisition of 309 East Broadway.

June 2, 2026: The City Council approved a $900,000 loan order toward acquiring the property.

October 23, 2026: The Water Department requested an increase in the original RCW loan order from $17,168,750 to $26,075,850 to accelerate construction.

November 2026: The City advanced emergency water supply improvements, permitting, procurement, and construction preparations for the permanent RCW.

The ongoing drought has reinforced the need to complete the permanent water source while implementing temporary measures to protect Haverhill's drinking water supply.

Construction Updates

Temporary Merrimack River Connection: N. Granese & Sons is scheduled to begin installing temporary piping and pumping equipment the week of November 23, 2026. Anticipated completion: January 2027.

The City initially proposed placing temporary piping along properties on Millvale Road to avoid costly roadway excavation and minimize construction disruptions. Unfortunately, the City was unable to obtain cooperation from all affected property owners, requiring the project to be redesigned to install piping underground within the roadway.

This change results in additional construction costs, increased roadway disruption, and a greater financial burden on the City.

Haverhill's water supply emergency affects our entire community, regardless of whether individual properties receive City water or use private wells. Cooperation from all residents is essential to minimizing unnecessary costs and ensuring these critical improvements can move forward as quickly and efficiently as possible. 

Methuen Water Interconnection: Construction is also scheduled to begin the week of November 23, 2026. Anticipated completion: January 2027.

Permanent Radial Collector Well: Engineering, permitting, and construction preparations are underway. Anticipated completion: July 2028.

Traffic Changes

Traffic impacts, road closures, and detour information will be provided as construction plans and schedules become available.

Financing

October 2016: City Council authorized $17,168,750 for the planning, design, and construction of the new Radial Collector Well and transmission main.

June 2, 2026: City Council approved a $900,000 loan order for the acquisition of 309 East Broadway.

October 2026: The City requested an increase in the original RCW loan order from $17,168,750 to $26,075,850 to advance construction.

State Revolving Fund (SRF): The City has submitted a funding application and is pursuing low-interest financing to help fund the project.

Community Engagement

The City continues to encourage residents to comply with water restrictions and practice conservation.

dcr-tips-for-saving-water-8-18-16.pdf

 

Contact Us

Haverhill City Hall
4 Summer Street
Haverhill MA, 01830

Monday - Friday 8:00 - 4:00
Call Center 311 (within city limits)
(978) 358-1311 (outside the city)

Online Service Requests