Groveland Road Landfill Closure

Project Overview

The City of Haverhill and Holcim-NER, Inc.will construct a final cap over the Northern Mound of the inactive Haverhill Landfill. The Haverhill Landfill is situated along the Merrimack River off Yemma and Old Groveland Road in Haverhill, MA. 

The final cap will isolate historically landfilled waste from the environment and prevent direct exposure to landfilled waste by both human and ecological receptors; significantly decrease the future production and release of pollution generated from landfilled waste to groundwater and surface water; and control emissions of landfill gas in a manner that prevents off-site migration towards structures and utilities. 

Project Information

Location

Groveland Road, Haverhill 01835 & Yemma Road, Groveland 01834

Ward

Ward 7

Project Type

Environment 
Parks and green space

Project Phase

Construction

Anticipated Completion

2028

Project Manager

Project Background

The site is locally known as the Southern Mound and the Northern Mound at the Haverhill Landfill on Groveland Road. The Southern Mound cap was completed in 2014 and currently hosts a 3.4-megawatt photovoltaic solar field. Capping of the Northern Mound is the last stage in remediation for the Haverhill Landfill.

The purpose and need of the Project are to cap the Northern Mound and the Lot 26 Ash Area in accordance with the MassDEP’s Solid Waste Management Regulations (310 CMR 19.000). Since the Haverhill Landfill is listed on the National Priorities List (NPL) established by the United States Environmental Protection Agency (EPA), the final cap and associated remedial or corrective actions at the Landfill also have to comply with the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA” or Superfund) as administered by EPA. 

Project Benefits

  • Construct a cap meeting MassDEP standards over Northern Mound and Lot 26 Ash Area;
  • Cap river-facing slope of Northern Mound with reinforced slope;
  • Develop stormwater system complying with MassDEP Regulations;
  • Incorporate gravel road to top of bank for maintenance and future public access;
  • Implement resource area and habitat mitigation; and
  • Install a public recreation area with a soccer field and walking paths.

Learn More About the Groveland Road Landfill Closure

Have questions?

Contact the Haverhill Conservation Department

Contact Us

Haverhill City Hall
4 Summer Street
Haverhill MA, 01830

Monday - Friday 8:00 - 4:00
Call Center 311 (within city limits)
(978) 358-1311 (outside the city)

Online Service Requests