Temporary Water Supply Connection & Radial Collector Well (RCW)
Project Overview
The City of Haverhill's drinking water supply relies primarily on Kenoza Lake, supplemented by Crystal Lake, Millvale Reservoir, and Round Pond. Nearly two years of insufficient rainfall have significantly depleted these reservoirs. Based on conditions reported to MassDEP in November 2026, the City projected that its remaining water supply could be depleted in approximately four months without sufficient replenishment or supplemental supplies.
With average daily water demand of 5.6 million gallons, reaching 7.8 million gallons during peak demand, the City is advancing temporary emergency water connections to the Merrimack River and the City of Methuen, subject to specified conditions, required testing, regulatory approvals, and ongoing MassDEP oversight.
The City is also accelerating construction of a permanent Radial Collector Well (RCW), anticipated to provide 5–9 million gallons per day, with a planning target of 7 MGD. Final capacity remains subject to a 30-day pumping test and MassDEP approval. This long-term investment will strengthen the City's water supply reliability and may provide additional capacity to help replenish Kenoza Lake.
Project Information
Location
309 East Broadway, Haverhill, MA 01830 up Millvale Road
Ward
Ward 4
Project Type
Water Supply
Project Phase
Design, Permitting & Construction
Anticipated Completion
January 2027 – Temporary Water Supply Connection to the Merrimack River
July 2028 – Permanent Well Installation
Project Manager
Robert Ward, DPW Director
John D’Aoust, Water Treatment Plant Manager
Andew Carvalho, Water Maintenance Supervisor
Shaun Burrier, Water/Wastewater Engineer
Consultant
Contractor
Project Background
The City of Haverhill has been working to develop an additional drinking water source for more than a decade. In 2016, the City identified the Merrimack River as its most viable option for meeting future water demands and providing a backup to its existing reservoirs. *pdf of 2016 notification
Wright-Pierce recommended constructing a Radial Collector Well near 309 East Broadway, using natural filtration through the riverbed to provide an additional source of drinking water.
With continued drought conditions placing significant pressure on existing reservoirs, the City is now accelerating the permanent well project while implementing temporary emergency water supply improvements.
Project Milestones
2012: The City Council adopted recommendations to pursue an additional drinking water source. *PDF to council doc
2014: Engineering studies confirmed the suitability of the East Broadway location. *PDF to ENF
November 24, 2020: The Water Department received approval from the Massachusetts Historical Commission (MHC) (EEA #15773) for the Merrimack River Radial Collector and Raw Water Main project
July 14, 2024: The Water Department requested pre-construction approval from the U.S. Army Corps of Engineers (USACE).
May 19, 2026: The City Council advanced the acquisition of 309 East Broadway.
November 5, 2026: The Water Department requested to declare a water supply emergency from DEP.
November 18, 2026: MassDEP declared a water supply emergency in the City of Haverhill and authorized the City, subject to specified conditions, to mobilize and construct temporary water supply solutions.
Construction Updates
Temporary Merrimack River Connection:
N. Granese & Sons is scheduled to begin installing temporary piping and pumping equipment the week of November 23, 2026.
Anticipated completion: January 2027.
11/20/2026
The City initially proposed placing temporary piping along properties on Millvale Road to avoid costly roadway excavation and minimize construction disruptions. Unfortunately, the City was unable to obtain cooperation from all affected property owners, requiring the project to be redesigned to install piping underground within the roadway.
This change results in additional construction costs, increased roadway disruption, and a greater financial burden on the City.
Haverhill's water supply emergency affects our entire community, regardless of whether individual properties receive City water or use private wells. Cooperation from all residents is essential to minimizing unnecessary costs and ensuring these critical improvements can move forward as quickly and efficiently as possible.
Permanent Radial Collector Well:
Engineering, permitting, and construction preparations are underway.
Anticipated completion: July 2028.
Traffic Changes
Traffic impacts, road closures, and detour information will be provided as construction plans and schedules become available.
Financing
October 2016: City Council authorized $17,168,750 for the planning, design, and construction of the new Radial Collector Well and transmission main.
June 2, 2026: City Council approved a $900,000 loan order for the acquisition of 309 East Broadway.
October 2026: The City requested an increase in the original RCW loan order from $17,168,750 to $26,075,850 to advance construction and install temporary water supply measures.
State Revolving Fund (SRF): The City has submitted a funding application and is pursuing low-interest financing to help fund the project.
Community Engagement
Sign up for text and phone call alerts through the City's notification system: https://public.everbridge.net/
The City continues to encourage residents to comply with water restrictions and practice conservation. Learn more here: Water Conservation
Learn More About the Project
State Grants $3.5M for Varied Haverhill Downtown, Well Water, Café Projects (WHAV, October 1, 2026)
Haverhill Council Signs Off on $1.8M East Broadway Purchase (WHAV, June 2, 2026)
Haverhill to Consider E. Broadway Taking, Status of Water Main-Damaged Home (WHAV, June 1, 2026)
Haverhill Reaches Pact to Buy Entire E. Broadway Parcel for Water Well (WHAV, May 17, 2026)
State Approves Low-Interest $66.5M Loan for Haverhill, $45M for Groveland, Others (WHAV, April 5, 2026)
Haverhill Councilors Can’t Agree on Land Taking for E. Broadway Well (WHAV, March 10, 2026)
Haverhill Councilors Put Off City Land Taking for Riverbank Well While Negotiations Continue (WHAV, February 11, 2026)
Haverhill Consider Supplemental Water Supplies, Including Those in Other Towns (WHAV, January 28, 2026)
Federal Delegation Secures Grant of $1 Million for Haverhill Riverbank Well Project—the State’s First (WHAV, January 18, 2026)
Basiliere Calls for Possible Land Taking to Speed 9-Year-Old Plan to Tap Merrimack River for Water (WHAV, October 7, 2025)
Council Approves River Well Plan; Rates to Increase 50% (WHAV, October 12, 2016)