Rosemont Street Bridge Replacement

Project Phase

Active Construction

Location

Rosemont Street, Haverhill 01830

https://maps.app.goo.gl/Ni7VE6raxB6RTs7R6 

Overview

Constructed in 1934, the Rosemont Street bridge connects Hilldale Avenue and Main Street by crossing the Little River, a perennial stream. Commercial and residential traffic often use this road as a thru-way to reach the highway. After nearly a century of heavy use, the structure has extensive deterioration which requires replacement.

The existing bridge will be demolished and replaced with a longer structure to fully meet the Massachusetts Stream Crossing Standards. Restoration of the stream bed and banks are required post-construction. This project addresses the safety, structural, and operational deficiencies of the current bridge and fully accomplishes Massachusetts Stream Crossing Standards.

Contractor

BETA Group, Inc. 

Anticipated Construction Duration

Construction is expected to take 1 year.

Traffic Changes

Rosemont Street will be closed for the duration of construction. 

Contact Us

Haverhill City Hall
4 Summer Street
Haverhill MA, 01830

Monday - Friday 8:00 - 4:00
Call Center 311 (within city limits)
(978) 358-1311 (outside the city)

Online Service Requests